An ongoing project.
The project consists of building a 104-meter-high headframe at the Outokumpu Chromium Mine in Kemi. The 66-meter-high part above ground was built using the slip forming method. In this project, we cooperate with NCC Suomi Oy, supplying and installing ca. 2,500 tons of steel reinforcement.